FFS | Building Integrated Systems News - FFS | Building Integrated Systems

News

draftingprints

Job Listing: Electrical Engineer

First Fire Systems, Inc.  located in Los Angeles, CA is seeking an Electrical Engineer with a Bachelor’s Degree in Electrical Engineering or related with 12 months experience.  Please fax resume to Robbie at 323-965-2700   Job duties:   Designs electrical equipment, facilities, components, products, and systems for commercial, industrial, and residential structures. Designs and directs engineering personnel in fabrication of test control apparatus and equipment, and determines methods, procedures, and…

Read more

draftingprints

Job Listing: Electrical Drafter

First Fire Systems, Inc.  located in Los Angeles, CA is seeking an Electrical Drafter with 2 yrs. experience.  Please fax resume to Robbie at 323-965-2700 Duties: Cooperate with assigned electrical engineer to draft executive coordinated fire protection plan in order to support system installation including field visits, inspection and survey. Use of computer design programs like AutoCAD to draw sketches and create necessary documents. Proof and ensure the quality of…

Read more

forum-ffs-22

Job Listing: Network and Computer Administrator

First Fire Systems, Inc. located in Los Angeles, CA is seeking a Network and Computer Administrator with a Bachelor Degree in Computer Engineering or related with 2 yrs. experience. Please fax resume to Robbie at 323-965-2700.

Read more

hoj-1

Hall of Justice Renovation

The Hall of Justice was originally built in 1925, and closed because of seismic damage from the 1994 Northridge earthquake. Historical renovations will include extensive cleaning of the exterior granite and restoration of the marble-clad grand lobby and loggia. The original elevator cabs will be refurbished and installed into the new elevators. In addition, the historic staircases along with one of the courtrooms and law libraries will be preserved and…

Read more

forum-sign

The Forum

The reinvention of the Forum has resulted in a world-class entertainment venue that bridges its iconic past with today’s state-of-the-art technology and amenities. The reinvention of the Forum has created the largest and most important indoor performance venue in the country designed with a focus on music and entertainment. The Forum reinvention was inspired by the venue’s original 1967 design, and includes upgrades to the entire venue site. Among the…

Read more

rose-bowl-1

Rose Bowl Renovation

The improvements to the stadium, although subtle, will make remarkable improvements to the experience while maintaining it’s iconic and historic status; new press box, less cluttered stadium rim, new video board, wider tunnels, added aisles, elliptical field, restoration of historic field hedge, added concessions, and added restrooms. Quisque adipiscing commodo turpis, eu tincidunt tortor pharetra a. Aliquam vel metus ut nisl convallis posuere ut at felis. Phasellus mollis dolor at…

Read more

npb-indoor1

Newport Beach Civic Center

The Civic Center & Park Project includes a city hall building, one of the city’s largest parks, a 450-space parking structure, and an expansion of the Newport Beach Central Library. It is located on two parcels inland of the Newport Beach Central Library and bordered by Avocado Avenue and MacArthur Boulevard. The project is scheduled to be completed by the end of 2012. A 17,000-square-foot expansion of the Newport Beach…

Read more